There is a technological middle of province stage, EPG academician doing work station, experiment station for EPG post physicians, and countrywide 863 software established up in EPG group. With these platforms and strong complex capacity, the far more than 400 experts have produced all assortment of particular substantial exact and substantial strength merchandise, executed mold applications for crucial components in the automobile and countrywide business revitalizing system, resulting a lot more than 5000 designed over, amongst which 33 things are autonomous patent engineering with four patent authorized . EPG has been efficiently certified by ISO9002 Top quality Administration Program, ISO9001 Top quality Management System, API certification, ISO/TS16949:2002 and ISO10012 measurement management system. In 2000, EPG took the guide in attaining ISO14001 atmosphere administration certification and thereafter handed the inspection of thoroughly clean generation and recycling economic climate, profitable the title of “Zhejiang Green Business”.
2TON DOUBLE CABIN Developing EPTER BY HSTOWERCRANE
Item Description
EPTT lifts (also recognized as design elevator) is extensively utilized in staff and material building vertical raise transportation. In EPTT or civil, huge bridges, silos, are indispensable to great transportation faXiHu (West EPT) Dis.Hu (West EPT) Dis.ties.
SC200 / two hundred development hoist complex performance parameters
Efficiency parameters | Product | SC200/two hundred | SC200/200A | |
Rated load (KG) |
2000×2 | 2000×2 | ||
Rated quantity of occupants (People) |
12×2 | 12×2 | ||
Rated lifting velocity (m/min) |
33.4 | 33.four | ||
MaXiHu (West EPT) Dis.mum lifting top (m) |
a hundred and fifty | 150 | ||
Rail body dimension (m) |
.65×0.65×1.508 | .65×0.65×1.508 | ||
Cage Measurement (m) |
three.0x1.3×2.5 | 3.2×1.5×2.5 | ||
Electric powered motor | EPTT(KW) | a | 11KW x three | 11KW x 3 |
b | 18KW x two | 18KW x two | ||
EPTT |
Framework | Turbine shaft | Turbine shaft | |
Drive ratio | 1:sixteen | 1:16 | ||
Basic safety device |
Product | SAJ40-one.2A | SAJ40-1.2A | |
Type | Progressive | Progressive | ||
Rated working velocity(m/s) | one.two | 1.2 | ||
Rated brake load(KN) | 40 | 40 | ||
Quit layer mode | a | EPTT | EPTT | |
b | Manually | Manually | ||
EPTT | Rated load | 180KG | 180KG |
Primary feature:
1.EPTT with 3 EPT or two EPT sort, so that the EPT rack force uniform, safe and steady.
2.In orEPTTto make sure the risk-free procedure of the lift, the circuit is established overload, the pace limit and other basic safety switch, when the prevalence of operation, the carry instantly and immediately EPTT down, to keep away from accidents.
three.Each and every cage is equipped with anti-drop basic safety unit, it can be really effective to avert the falling cage, to make certain risk-free and reputable procedure of the raise.
4.Every cage is equipped with EPTd digital sensing overload limiter, to steer clear of lifting equipment because of to overloading brought on by equipment and private accident.
five.EPT line EPT manage program is straightforward, effortless to manipulate, fix and servicing. Optional flooring pager, straightforward to use and fast.